Our Earthworks team in Darwin recently provided a range of quality testing of fill, subgrade, subbase and basecourse pavement materials for the Gunn Point Road upgrade.
The project comprised sealing over 20km of road which included numerous culvert crossings. When completed, the the works provided improved road safety, reduced travel times, reduced damage to vehicles and reduced ongoing road maintenance costs.
The project which was completed for the Department of Infrastructure Planning and Logistics (DIPL), was awarded in three packages with Douglas Partners being a part of all three packages providing contractual conformance testing. We were also able to provide test bore drilling during the design phase of the project and concrete sampling and testing during culvert construction.